Plumbing Stub-Up Leaning Off Vertical
September 2026, during frame installation. Photo 8 of 8 from my own lot. Resized only; nothing retouched except where the caption says so.
Open full size (1350×1800)
What the photo shows
My project record
- A PVC stub-up leaning well off vertical where it passes through the slab, with disturbed concrete at the base.
- Tire tread marks sweeping across the slab in the foreground.
- The base rail of the building and a dirt pile at the far edge.
What it does not prove
Whether the pipe below the slab is broken. That will take a plumber, and it is on my list.
Where it fits
Around September 4, 2026. The stub-ups were straight before the pour (P-01). The damage was reported publicly by me at the time and is one of the items in the dispute.
Previous: P-07. All photos.