Independent customer review. Not affiliated with, sponsored by or endorsed by L&G Building & Concrete. How this site is sourced

LG Building & Concrete Review

Frame Corner Detail: Column, Header and Brace

Early September 2026. Photo 5 of 8 from my own lot. Resized only; nothing retouched except where the caption says so.

Corner of the steel frame seen from below, showing the column, header, a diagonal brace and two open tube ends

Open full size (1350×1800)

What the photo shows

My project record

  • A corner column with a header running off it and a diagonal brace tied back into the truss.
  • Two short tube ends projecting from the column, open.
  • Galvanized 14-gauge tubing, consistent with the order.

What it does not prove

Whether the connections are complete or correct is an inspection question. The county’s framing inspection, when there is one, will say.

Where it fits

Early September 2026. I include it because it is the clearest view of the materials and connections as left by the crew, and because any future inspection report will refer to details like these.

Previous: P-04. Next: P-06. All photos.